Guaranteed 12-Month Delivery
From contract to keys – a firm commitment backed by proven expertise and milestone-based transparency
12-Month Delivery: Controlled & Transparent Process
From construction start to key handover, track every step in real-time
When Construction Begins
The 12-month construction timeline begins once main construction officially launches. This launch occurs when a minimum of 80% of the project is sold.
This condition guarantees that all remaining villas are built simultaneously and completed together. Owners can move in or operate their property immediately, without suffering the disruption of staggered construction next door.
Even if the remaining 20% are not sold by this date, construction starts anyway. No villa is left waiting: all progress at the same pace.
Project Sales Progress
80% Sold = Construction Launch Guaranteed
No staggered construction. All villas completed simultaneously.
3 Villas Already Under Construction
Completion: End of June 2026

Advanced stage - June 2026 delivery
Of the 19 planned villas, 3 are currently in advanced construction and will be completed by the end of June 2026. Prospects can visit the site by appointment to:
Directly observe the quality of materials and construction methods in real-time
Witness the precise progress and rigor of the process
Visualize the final result from ongoing works
These 3 villas serve as concrete reference and demonstrate the reliability of our timeline.
Visit the Construction Site
See for yourself. Schedule your visit.
Structural Time Savings Through Advanced Common Infrastructure
20-30% time advantage over standard Samui projects
Work on these first 3 villas has enabled completion of a large portion of common elements:
- •Complete estate terracing
- •Paved and lit access roads in final stages
- •Underground electrical networks (power + fiber optic) already installed across most of the site
- •Sewage and stormwater drainage largely implemented
- •Overall site drainage operational
These phases, which typically cause 20-30% of delays in standard Samui projects, are already well advanced. Result: once main construction launches, teams can directly attack the structural work on remaining villas without time lost on collective infrastructure.
0-30%
Time Advantage vs. Standard Projects
Infrastructure Completion Status
Timeline Comparison
Total Transparency via THEVA App & Live Cameras
Your personal construction control center
Each buyer has their personal control center: the THEVA App. It centralizes:
- •Real-time construction progress tracking (percentage, validated milestones)
- •Precise payment schedule calendar
- •All contractual documents, plans, invoices, amendments, and certificates
- •Automated weekly reports with geolocated photos
Additionally, high-definition live cameras are installed on-site. Secure 24/7 access via the app: panoramic view and zoom on each work zone. Even abroad, the owner sees exactly what's happening on their construction site, without depending on an intermediary.
Real-Time Progress
- • Percentage completion
- • Validated milestones
- • Live updates
Payment Schedule
- • Precise due dates
- • Automated reminders
- • Full transparency
Document Hub
- • Contracts & plans
- • Invoices & certificates
- • Instant access
Weekly Reports
- • Geolocated photos
- • Construction updates
- • Professional documentation
LIVE24/7 Live Site Cameras
Watch your villa being built from anywhere
Detailed 12-Month Construction Timeline
From main construction launch to key handover
Foundations & Individual Networks
Site preparation, foundation work, individual utilities per villa
Structural Work & Weatherproofing
Main structure, roof and walls, weatherproof shell
Finishing & Pool Construction
Interior walls, windows/doors, swimming pool
Complete Interior Fit-Out
Flooring, kitchen & bathrooms, fixtures & fittings, painting
Finishing Touches & Exteriors
Landscaping, final details, quality checks
Final Inspections & Key Handover
Quality control, deep cleaning, official handover, move-in ready
Why THEVA Horizon Samui Delivers in 12 Months
Pre-Advanced Infrastructure
85% of common works already completed
Controlled Launch
80% sold threshold ensures no delays
Simultaneous Construction
All villas built in parallel, no staggered delivery
Total Transparency
THEVA App + live cameras = real-time control
Buyers control everything, remotely, in real-time. No surprises. No delays. Just guaranteed delivery.
5-Year Exceptional Warranty Included
Every THEVA Horizon villa is backed by our comprehensive 5-year warranty. From foundations to finishes, your investment is fully protected with coverage that exceeds Thailand's standards.
LEARN MORE ABOUT OUR WARRANTYGrand Opening Countdown
Be among the first to experience THEVA Horizon Samui. Our grand opening celebration awaits.
0
Days
0
Hours
0
Minutes
0
Seconds
Ready to Invest in Paradise?
Schedule a private villa tour or download our comprehensive investment brochure to learn more about our guaranteed delivery promise.
Ready to take the next step?
Request a Private PresentationContinue Exploring